Case Studies
Case Studies tagged with: Building Management Systems (BMS)
-
Greenspaces Design
A building project for IT/ITES office spaces including retail, hotel, medical, facilities. The purpose of the designs by Greenspace is to maximise daylight, reduce heating, regulate and reduce electricity consumption, generate solar power from roof-mounted PV modules; and make use of technologies such as geothermal cooling, LED lighting, and water conservation techniques.
-
Waltham, MA LEED Building Construction
The new 61,000 square foot complex was built according to the U.S. Green Building Council standards to demonstrate Leadership in Energy and Environmental Design (LEED). Autodesk has achieved LEED Platinum CI Certification for the interior and LEED Gold Certification for the building’s core and shell. Not only does the building’s design and construction comply with green standards, daily building operations will focus on sustainability. The building employs the latest technology in energy efficiency and control systems.
-
Empire State Building Retrofit
Built during the Great Depression, the Empire State Building symbolizes America's limitless potential. Today the building is undergoing a major sustainability retrofit to become a leading example of economic and environmental revitalization. Consulting, design, and construction partners Clinton Climate Initiative (CCI), Johnson Controls Inc. (JCI), Jones Lang LaSalle (JLL), and Rocky Mountain Institute (RMI), recently completed an 8 month modeling and analysis project which will save up to 38 percent of the building's energy and $4.4 million annually. See www.esbsustainability.com for more info





